Sale!

Osama Abdel Aziz – Testing Commissioning 115 KV GIS Part 2

Original price was: ₹12,000.00.Current price is: ₹1,494.00.

-88%

Description

Testing Commissioning 115 KV GIS Part 2, Osama Abdel Aziz – Testing Commissioning 115 KV GIS Part 2, Testing Commissioning 115 KV GIS Part 2 download, Osama Abdel Aziz – Testing Commissioning 115 KV GIS Part 2 review, Testing Commissioning 115 KV GIS Part 2 free torent
Osama Abdel Aziz – Testing Commissioning 115 KV GIS Part 2
Testing Commissioning 115 KV GIS Part 2

Testing Gas Insulated Substation
What you’ll learn

Advantages of GIS : Gas Insulated Switchgear (Substation)
Challenges of Testing Gas Insulated Substation
How to Use Earth Switch in Testing ?
Test Contact Resistance of the Circuit Breaker By Conventional Method
Test Contact Resistance of the Circuit Breaker By DualGrounding Method
Test Contact Resistance of the 115 KV GIS BusBar
Timing Test of the Circuit Breaker
Timing Test of the Isolator Switch
Timing Test of the Earth Switch
10 KV Test For Earth Switch
Challenges of Testing Instrument Transformers
The Purpose of The Characteristic Test in Current Transformer
The Importance of The CT Loop Test
The Purpose of The Primary Test in Current Transformer
The Purpose of The Characteristic Test in Voltage Transformer
The Importance of The VT Loop Test
Which is better MRCT or CT Analyzer with Current Transformer Tests ?
Functional and Interlocking Test
The Purpose of The BusBar Stability and Sensitivity Test
The Importance of The High Voltage Test
Partial Discharge Sensors
how to Test Partial Discharge in Site ?

Requirements

The basic electrical principles
Description

Dear fellows,
This is the most comprehensive online training of gas insulated substation . Here you will learn all thing about GIS.
Gas insulated substations are the most common type of substation that you will find on the electrical network, due to their effectiveness and simplicity.
This course will give you an appreciation of how to Testing,commissioning this type of substation and introduce you to all of the equipment’s that you will find in a typical gas insulated substation.
we will go through the following topics

Advantages of GIS : Gas Insulated Switchgear (Substation)
Challenges of Testing Gas Insulated Substation
How to Use Earth Switch in Testing ?
Test Contact Resistance of the Circuit Breaker By Conventional Method
Test Contact Resistance of the Circuit Breaker By DualGrounding Method
Test Contact Resistance of the 115 KV GIS BusBar
Timing Test of the Circuit Breaker
Timing Test of the Isolator Switch
Timing Test of the Earth Switch
10 KV Test For Earth Switch
Challenges of Testing Instrument Transformers
The Purpose of The Characteristic Test in Current Transformer
The Importance of The CT Loop Test
The Purpose of The Primary Test in Current Transformer
The Purpose of The Characteristic Test in Voltage Transformer
The Importance of The VT Loop Test
Which is better MRCT or CT Analyzer with Current Transformer Tests ?
Functional and Interlocking Test
The Purpose of The BusBar Stability and Sensitivity Test
The Importance of The High Voltage Test
Partial Discharge Sensors
how to Test Partial Discharge in Site ?

Who this course is for:

Anyone interested in electrical engineering
Electrical undergraduates
Electrical graduates
Workers in the electrical utility industry
Electricians

Course content
Introduction

GIS Basics
Testing Challenges
Grounding links removed for testing
Interview Question

Circuit Breaker Tests

CB Contact Resistance
BusBar Contact Resistance
Contact Resistance Test By MOM 600
Timing Test For CB
Injection Kit With Circuit Breaker
CB Timing Test on Site
Timing Test By DualGrounding Methode
Interview Question

Dissconnector Switches Tests

Timing Test For Earth Switch
Timing Test on Site For Earth Switch
Bus Diss Timing Test
Fast Earth Switch
10 KV Test
Interview Question

Current Transformer Tests

Instrument Transformer Test Challenge
Insulation Resistance Test
Connection MRCT With CT
PowerDB Software
CT Characteristic Test
CT Analyzer or MRCT
CT Loop Test
Single Earth Point
Primary Injection Test
Primary Injection Test Sheet
Primary Injection Test on Site
Interview Question

Voltage Transformer Tests

IVT and CVT Voltage Transformer
CVT IR and Polarity and Turns Ratio Test
VT Characteristic Test
VT Loop Test
Interview Question

Function Test

Mechanical Check and Visual Inspection
DC Check and Earth Problem
CB Closing – Triping and blocking condition
4- Check Operation and Indication
Functional and Interlocking Test
Interview Question

BusBar Stability Test

Stability Test
Sensitivity Test
Stability Test on Site
Interview Question

High Voltage Test

Partial Discharge
Partial Discharge Sensor
High Voltage Test on Site
Interview Question

Instructor
Osama Abdel Aziz

Bachelor of Electrical engineering (power & machines).

Osama Abdel Aziz
Hello,
I’m Osama Abdel Aziz
Electrical Power Systems Engineer
I Have
Bachelor of Degree in Electrical Power and Machines Engineering
i am work naw as protection enginner in EETC company
I share with you my academic and practical experience
I I find a real joy in teaching :).
Choosing an interesting and challenging field such as electrical engineering is a blessing and a gift I’m grateful For
Excellent knowledge and delivering the theory and practical concept with such an ease.
Trainer possesses strong competency in power plant and substation secondary system, scheme like busbar protection, breaker failure protection, substation automation, transformer differential, substation schemes lines/transformer/reactor/busbar, testing & commissioning of relays, scheme testing, testing of GIS/AIS substation equipment, testing of generator protection, on site trainings.